According to the cire. pl portal, on the basis of the published Activity Report of the President of the Energy Regulatory Office (ERO) in 2018, there is a significant increase in the refusal to issue conditions for connection to the power grid. These discussions were caused by a lack of technical conditions and by economic considerations.
- Post published:6 June 2019
- Reading time:1 mins read